Campus

Otakaari 2: Marsio and Kide

Marsio (Otakaari 2A) & Kide (Konemiehentie 1, previously Otakaari 2B) will bring a lot of new state-of-the-art teaching and research space, as well as much-needed event and studio space to Otaniemi. Work began in February 2022, and is scheduled for completion in 2023-2024.
Marsio
Image: Mikko Raskinen
Marsio
Marsio. Illustration image: Mikko Raskinen

Marsio

Approximately 6,500 brm2 of state-of-the-art multifunctional space for teaching, research, events and a studio centre will be completed at Marsio (Otakaari 2A). Its facilities will be equipped with new digital technologies that enable cross-disciplinary research and teaching, and will take Aalto's events to a new level, both on campus and virtually.

The aim of the new building is to showcase for Aalto's unique research and teaching both in Finland and internationally. In addition to the facilities serving Aalto's users, the building will have space for restaurant and event service operators.

Kide
Kide. Image: Mikko Raskinen

Kide

The Kide building (Konemiehentie 1, previously Otakaari 2B) brings approximately 5,700 brm2 for teaching, research and office space to the School of Science and the School of Electrical Engineering. The new building will be connected to the Nanotalo building and Aalto Nanomicroscopy Center, allowing for more collaboration in the field of nanotechnology.

The building complements the range of facilities in the universities and brings flexibility to the operation of the higher education institutions.

Schedule and construction

The construction site of the buildings was fenced off at the beginning of January 2022, when the parking spaces at the Otakaari 2B construction site were also removed. At the same time, the pedestrian ways and cycle lanes were completely moved to Väre and the School of Business building side. Construction sites may cause temporary disturbances on Otakaari, Maarintie and Konemiehentie.

Work began in February 2022. The buildings are estimated to be completed in 2023-2024.

Developer Aalto University Campus & Real Estate
Contractor: NCC
Design: SARC Architects

Information
Marcus Korhonen, Director (Marsio, Aalto Studios),
[email protected], tel. 040 012 9629

Jarmo Wilander, Director, Construction (Aalto University Campus & Real Estate),
[email protected], tel. 040 541 3304

Tuomas Kostia, Construction Project Manager, (Aalto University Campus & Real Estate), [email protected], tel. 050 522 5480

For media
Noora Stapleton, Senior Communications Specialist,
[email protected], tel. 050 353 1525

Images of Marsio & Kide buildings

    Illustration image depicting what Otakaari 2 could look like, people walking and cycling near Otakaari and Maarintie, man with sunglasses looks to the viewer, its sunny and there's an event in the corner of the building

    Illustration image from the Undergraduate Centre point of view. Image: SARC Architects

    Illustration image set in sunset, depicting Otakaari 2 buildings in the future. People walking around and the lights are on in the building.

    Marsio and Kide, view from Undergraduate Centre at dusk. Image: SARC Architects

    Illustration image of a spring or summer view from Otakaari towards Väre, Otakaari 2B on the right side of the image, sun is shining, there are flowers in bloom on the left of the image. Lots of people walking, cycling and interacting near the building.

    Illustration image of Marsio's facade (right), with Väre building in the background. Image: SARC Architects

    Illustration image on a sunny day as the sun is setting, of Otakaari 2A, the lights in the building are lit and there are blurry images of people walking around. Grass and trees are green.

    Marsio, illustration image from the other side of Maarintie. Image: SARC Architects

    Illustration image of an early autumn day, depicting Otakaari 2B from the opposite side of Tietotie. Some leaves are on the ground, there are people walking on campus, undistinguishable faces.

    Kide, illustration image from Maarintie and Konemiehentie crossing. Image: SARC Architects

    Illustration image of an aerial view over Otaniemi campus at dusk, depicting Väre, School of Business, parts of the Undergraduate Centre, Otakaari 2A and Otakaari 2B.

    Illustration image of an aerial view of the centre of the campus, with the new buildings. Image: SARC Architects

    Images from the foundation stone laying ceremony 29.9.2022

      Peruskivenmuuraustilaisuus OK2

      Marianna Bom, Kirsti Jerkku, Janne Laine, and Antti Ahlava laying the foundation stone. Image: Mikko Raskinen/Aalto University

      Aalto_University_Otakaari2A_Name_Reveal_and_Foundation_Stone_29-9-2022_photo_by_Mikko_Raskinen_012.jpg

      The new name of the Otakaari 2A building, Marsio, was announced during the laying of the foundation stone ceremony. Image: Mikko Raskinen/Aalto University

      Aalto_University_Otakaari2A_Name_Reveal_and_Foundation_Stone_29-9-2022_photo_by_Mikko_Raskinen_027.jpg

       Image: Mikko Raskinen/Aalto University

      Aalto_University_Otakaari2A_Name_Reveal_and_Foundation_Stone_29-9-2022_photo_by_Mikko_Raskinen_042.jpg

      In front of Marsio. Image: Mikko Raskinen/Aalto University

      Images from the topping-out ceremony 4.5.2023

        Harjannostajaisväkeä. Puhumassa Marianna Bom / Aalto-yliopisto.

        Participants at the topping-out ceremony. Speaking Marianna Bom / Aalto University

        Harjannostajaisväkeä

        Participants at the topping-out ceremony.

        Puhumassa Ville Jokela / ACRE

        The ceremony was opened by Ville Jokela / ACRE.

        Puhumassa Kati Tauriainen / NCC

         The speech on behalf of the main contractor was held by the NCC Managing Director Kati Tauriainen.

        Puhumassa Marianna Bom / Aalto-yliopisto

        Aalto University's speech was held by Chief Financial Officer Marianna Bom.

        Retuperän WBK

        The music was provided by Retuperän WBK at the ceremony.

        Read more

        Illustration image on a sunny day as the sun is setting, of Otakaari 2A, the lights in the building are lit and there are blurry images of people walking around. Grass and trees are green.

        The new Marsio building is a showcase for research, teaching and impact at Aalto University

        The name was selected through a contest, and it is a tribute to Aino Marsio-Aalto.

        News
        An aerial image from early autumn of a new building soon to be finished on campus.

        Kide – the new name of the new building crystallises the bond between different disciplines

        As a result of a naming competition, the Otakaari 2B building was given a new name

        News
        A stairway leading down to a sunlight-filled lobby, with two paintings on the concrete walls of the staircase.

        Shared imagination and between waves - the themes of Marsio and Otakaari 2B's art collections reflect Aaltonians

        The themes, artists and drafts of the new buildings' art collections were published

        News
        Illustration image set in sunset, depicting Otakaari 2 buildings in the future. People walking around and the lights are on in the building.

        Two new buildings to be built in the centre of Otaniemi campus

        Building Otakaari 2A & 2B begins in January 2022, construction to be completed by summer 2023

        News
        Jukka Mäkelä ja Ilkka Niemelä

        Long live the campus! The foundation laying ceremony of Otakaari 2 celebrated the university's new buildings

        The foundation of the Otaniemi campus' newest buildings, Otakaari 2A and 2B, was laid on September 29. The new name of the Otakaari 2A building was also revealed at the event

        News
        A man and woman in casual wear, dark tones, smiling at the camera inside the Aalto Hall.

        Marsio - the obvious choice

        Background of the proposals that won the naming competition

        News
        Aalto_University_Otakaari2B_

        Kide

        Konemiehentie 1

        Locations

        Campus news

        Campus Sustainability Champion 2024 voittajat
        Awards and Recognition, Campus Published:

        Student-driven projects to become Campus Sustainability Champions

        This year, two student-led projects were selected as Campus Sustainability Champions. The awards were presented at the annual ACRE Day on 9 October 2024.
        Aalto_University_Squad_students_May-2023_by_Aleksi_Poutanen_4754.jpg
        Campus, Studies, University Published:

        The HSL card will no longer function as an access token on the Otaniemi campus 15.11.2024

        At the Otaniemi campus, the HSL card will no longer be used as an access token starting from November 15, 2024.
        Poikkeustilanne-kuvitus
        Campus, Incidents, University Published:

        Summer and autumn brings changes at Aalto University metro station

        Renovations to Aalto University metro station will close the entrances in summer 2024
        1KOMMA5°
        Campus Published:

        The 1KOMMA5° showroom of smart energy solutions is now located in shopping centre A Blanc

        Welcome to the Open House 1KOMMA5° Suomi Showroom from Wednesday to Friday 9.–11.10.2024. 1KOMMA5° provides smart energy solutions to enable carbon-neutral energy in Finnish homes by offering solar panel systems, batteries and electric vehicle charging stations.
        • Published:
        • Updated: