News

Core network failure caused power outages on Otaniemi campus

Power was cut from multiple buildings on campus but returned by 15.25
campus kampus Otakaari 1 winter talvi Kuva: Mikko Raskinen / Aalto-yliopisto

Power was out at shopping centre A Bloc (Otaniementie 12), Väre building (Otaniementie 14), School of Business building (Ekonominaukio 1), Metallimiehenkuja 2 and Metallimiehenkuja 4 but returned at around 15.00. The power returned to Undergraduate Centre (Otakaari 1) at around 15.25.

The problem was in the core network. The power failure began at 14.03.

  • Published:
  • Updated:
Share
URL copied!

Read more news

Graphic for Aalto Creatives
Campus, Cooperation Published:

Call for applications: Aalto Creatives pre-incubator programme starts in March 2025

The application period for the Aalto Creatives pre-incubator programme is open until 10.2.2025
Studies, University Published:

From coffee rooms to big crowds – Discussion is important in developing new lifewide learning content in Aalto

Craig Carlson is developing educational content for the target audience of lifewide learning, such as adult learners in working life.
ınterns
Research & Art, University Published:

Pengxin Wang: The internship was an adventure filled with incredible research, unforgettable experiences, and lifelong friendships.

Pengxin Wang’s AScI internship advanced AI research, fostered global friendships, and inspired his journey toward trustworthy AI solutions.
Cooperation, University Published:

Talent Boost Strategy Project at Aalto in 2021-2024

This article takes a look at the achievements of the Talent Boost project at Aalto.